NYC 9/11 Public Portal Document
B.@ ENVIRONMENTAL CONSULTANTS, INC. DAILY CONSTRUCTION REPORT
cunt: PCD ef? PROJECT NUMBER: [O13| - [2[7] in gy-| | |
® HAL: prosect MANAGER: [A « Al: han
TECHNICIAN: S Kast sks SIGNATURE: KA 4 = DATES / Fod/ OE
ETS PHASE ms
CONTRACTOR:
CONSTRUCTION ACTIVITIES - NARRATIVE DESCRIPTION OF ACTIVITIES
(Enter times in and out of the work area and time of observation in applicable column)
TIME TIME
IN OUT ; F
171 Ged at! are doign the
list out. S 2-7 har fd rong
ed teod a. Cede. Cleda ting P= tod need’ llude
a P be 2h i
{7~> bi erdtbas Oar : RE a baa ra On
175 oS 2 a I
12/0 , Bic Se plon tech “has —cafacag! Yo 5
hugs War TE, be wal S29 les of 2% haat Sife,
ea 7 a EF ipl —S Leia
] Pod ot shat. é
SHEET A oFo>
NYC-WTC_000132387
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000132387Source: NYC Law Department, mirrored locally