Document / 214 pages
Daily construction report, NYC WTC site, Sept 2001 Machine-extracted title · confidence 95% JLC Environmental Consultants daily log of construction activities and observations at the World Trade Center site.
NYC-WTC_000132262–000132475 Save to case Cite this page ↗
More like this page Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Sampling summary report, PS/IS 89M, Feb 2002 · page 39 · Box DEP Box 02 NYC-WTC_000096460
Cover letter summarizing wipe and air sampling results for asbestos and other contaminants at PS/IS 89M dated February 7, 2002.
Similarity score 0.972 (not a probability)
TEM air sample results, 125 Liberty St, Oct 2002 · page 229 · Box DEP Box 54 NYC-WTC_000131492
Chain of custody and cover letter for transmission electron microscopy analysis of air samples from apartments at 125 Liberty Street.
Similarity score 0.972 (not a probability)
Chain of custody for air samples from 125 Water Street, · page 262 · Box DEP Box 53 NYC-WTC_000129725
Custody form documenting the transfer and analysis of air samples collected at 125 Water Street in September 2002.
Similarity score 0.972 (not a probability)
Asbestos fiber analysis chain of custody, 125 Cedar Street, Sep · page 43 · Box DEP Box 38 NYC-WTC_000107682
Chain of custody form for asbestos fiber analysis samples received at ATC Associates on September 20, 2002 for the DEP cleanup project at 125 Cedar Street.
Similarity score 0.972 (not a probability)
Chain of custody for air samples from 125 Water Street, · page 253 · Box DEP Box 53 NYC-WTC_000129725
Custody form documenting the transfer and analysis of air samples collected at 125 Water Street in September 2002.
Similarity score 0.972 (not a probability)
Air sampling summary letter, 400 Chambers Street, April 2002 · page 92 · Box DEP Box 36 NYC-WTC_000102767
Cover letter submitting ambient air sampling and cleanup activity summary for 400 Chambers Street to DEP.
Similarity score 0.972 (not a probability)