NYC-WTC_000128975
228 ast 4th Stree WARREN & PANZER ENGINEERS, P. C. pace _/ oF —
New York, NY 10017 . °
(p12) 922-0077 g f oO AIR MONITORING LOG SHEET/CHAIN-OF-CUSTODY FORM
Fax (212) 922-0830 tame bs hte 6 t/a Shrtia immediate */a P.O.
" W8P FILE #: Lote ae 92 :
CLIENT: NYC DE D _ LABORATORY::- CONTACT: PKC NG/ aw
PROJECT. y 7 __ ANALYSIS nae x (te TEM
LOCATION: {22 Tulten Ave. - gircle one 7400 RA_PALEVEL II
TECHNICIAN:
“SAMPEE [- : SampLe = (SAMPLE | Pump |) FLOWRATE |. TIME’ | TOTAL vOLUME |CONCENTR,
NUMBER 23° DESCRIPTION/LOCATION 2 | TYPE | *@ 7 | START STOP. | ON | = OFF '| TIME | (iRers) (ffbJec.)
Tbr002-1 Ry Detonl TE vg | wo? 1920 | 309 l)50
Biron. -2\ VA tent of bodhe, | TRY oz yaoon | $9? \poeu
WBores2z-3|9Vv xf bo ror Ter iz. 1/732.) Gor jh 50
TREQ2-4 | pay vied port [Em Hod 1424 | $9? {1509
TRh91- Glow 4th Floor TES leg 1426 | 589 |) 500
Borer 2 | Field Blane La ao lo 9 te
DBbo2002-T|_U td DME a ie) Qo |o
Bers. Pic id Bhar Dh Pro ae v g a
COMMENTS:
f
SAMPLE BY. J O0nhA- Inu DATE: 96-20. 02
SIGNATURE: th. Boaf __. ” SAMPLE TYPE. CODES”
RELEASEDBY/ phe Boyd hi: * DATE: ab-h04 ce 8 pactneti = oe roar oe =
SIGNATURE: ——— ; 2 - Pre-Abatement 6 - Final Clearance (outside)
RECEIVED BY: A/C & Ae BARGE Ra, DATE: </2?f¢ Luring Abatement > 7 - Personal
| SIGNATURE: S$ foo _ 7? ar | Gait ian Bag Removal |8.- Background
SE REVERSE SIDE FOR ANALYSIS INFORATa TEE
NYC 9/11 Public Portal Document
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000128975Source: NYC Law Department, mirrored locally
Invoice from Fiber Control, Inc. dated July 18, 2002, billing the Department of Environmental Protection for facade cleaning services at multiple job sites.
Invoice from Fiber Control, Inc. dated July 18, 2002, billing the Department of Environmental Protection for facade cleaning services at multiple job sites.
NYC Department of Transportation building operation permit authorizing pavement and sidewalk repair at 122 Fulton Street from June 23 to June 30, 2002.