NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 52/96 GREENWICH STREET 1001056, 53/39
Document / 4 pages

Asbestos removal invoice, 96 Greenwich Street, Nov 2002

Machine-extracted title · confidence 100%

Invoice from Asbestos Removal Corp for roof cleanup services at 96 Greenwich Street dated November 27, 2002.

NYC-WTC_000128480–000128483

Folder label: “96 GREENWICH STREET 1001056, 53/39”

Page image
Scanned page image, NYC-WTC_000128483
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• - NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 7600 0 ASBESTOS INSPECTION REPORT Basis of Inspection: FL sF LF O ONLYTYPEWR/T1EN I TRV1 MN02 RO APPL=7i SWatu NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED FEE EXEMPT: Yea ,3g2,ol-7 , ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. 80.00 OF START OF THE WORK (ABATEMENT ACTIVITIES) START DATE: I I 2 COMPLETION DATE: (f • 2002 L FACILITY _ 1 ADDRESS: G] .(n7JCG, dr - BORO: MANHATTAN ZIP: TYPE OFFACILtTY: BLOCK: LOT: II. BUILDING OWNER NAME: NIA TEL 0: ADDRESS: N/A N/A N/A N/A CITY: N/A STATE: N/A ZIP: 11368 IV. ASBESTOS ABATEMENT CONTRACTOR NAME: TRIO ASBESTOS REMOVAL CORP TEL. •: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION 9 : P11 ADDRESS: 14-20 129TH STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356 V. THIRD PARTY AIR MONITOR NAME: WAREN & PANZER GROUP TEL. if: ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER NYS ELAP;: 11251 ASBESTOS WORK SCHEDULE ® DAY ® EVENING ❑ NIGHT ® WEEKENDS ® WEEKDAYS

INSPECTOR NAME: (.t- Rffi/mm-p l6 -m SQUADS: BADGE is . DATE OF INSPECTION: 1,11° — (I/(O/O2-TIME OF INSPECTION: From: :co AM PM 4 70: ^ ^ 40 AM . Contact at cite: Yetzs » LtJllort OG YQ go A?5n /p .r► L , _I Inspection disclosed that the following sections were complied with: (Check all that apply) 1.51 - Notifications, Reports, Plan 1-71 - Air Sampling and Monitoring fl 1-91 - Worker Protection 1-101 - Materials and Equipment E] 1.116. Work Place Preparation 1-117 - Worker Decontamktation System fl 1.118 -Waste Decontamination System 0 1-126 -Engineering Controls 1-127 - Entry/Exit Procedures 1-129 - Maintenance of Barriers 1-138 -Encapsulation 1-139 - Enclosure 1-140 - Glovebeg 0 1-141 -Tent 1-137 -ACM Disturbance, Removal, .Handing 1-146 - Preliminary Clean-up 1-147 - Final Clean-up Project not started , Inspection revealed all ACM to be intact. New start date: / Project ongoing, expected completion date: / Project completed on or about: / . All surfaces, Including abated surfaces are free of visible ACM and encapsulate Follow up necessary on / / Samples taken: No O Yes 1 2 3 4 5 a Photos taken: O Yes No Additional comments: 4fr4 J lid I —, .rz le fi tom,-f i;. 1& 6~ rcz 3 Yom_ iQ t -

L - iQ f?1~~ FP~w o - cjJc* hoer Q' CN u Gt v'YI {fe° ~I ta: e&i4 O'✓t 4t €. QYI i 5

BORO I - MANHATTAN 2 - BRONX 3 - BROOOKLYN 4 - QUEENS 5 - STATEN ISLAND RESULT CODES 1 - VIOLATION ISSUED 2 - NO VIOLATION ISSUED 3 - NO ACCESS uNotuua 4 - PROJECT NOT STARTED (NO NOV) 5 - PROJECT COMPLETED (NO NOV) ? Q

NYC-WTC 000128483

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128483Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →