NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/96 GREENWICH STREET 1001056, 53/39
Document / 4 pages

Asbestos removal invoice, 96 Greenwich Street, Nov 2002

Machine-extracted title · confidence 100%

Invoice from Asbestos Removal Corp for roof cleanup services at 96 Greenwich Street dated November 27, 2002.

NYC-WTC_000128480–000128483

Folder label: “96 GREENWICH STREET 1001056, 53/39

Page image
Scanned page image, NYC-WTC_000128483
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• - NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 7600 0 ASBESTOS INSPECTION REPORT Basis of Inspection: FL sF LF O ONLYTYPEWR/T1EN I TRV1 MN02 RO APPL=7i SWatu NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED FEE EXEMPT: Yea ,3g2,ol-7 , ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. 80.00 OF START OF THE WORK (ABATEMENT ACTIVITIES) START DATE: I I 2 COMPLETION DATE: (f • 2002 L FACILITY _ 1 ADDRESS: G] .(n7JCG, dr - BORO: MANHATTAN ZIP: TYPE OFFACILtTY: BLOCK: LOT: II. BUILDING OWNER NAME: NIA TEL 0: ADDRESS: N/A N/A N/A N/A CITY: N/A STATE: N/A ZIP: 11368 IV. ASBESTOS ABATEMENT CONTRACTOR NAME: TRIO ASBESTOS REMOVAL CORP TEL. •: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION 9 : P11 ADDRESS: 14-20 129TH STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356 V. THIRD PARTY AIR MONITOR NAME: WAREN & PANZER GROUP TEL. if: ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER NYS ELAP;: 11251 ASBESTOS WORK SCHEDULE ® DAY ® EVENING ❑ NIGHT ® WEEKENDS ® WEEKDAYS

INSPECTOR NAME: (.t- Rffi/mm-p l6 -m SQUADS: BADGE is . DATE OF INSPECTION: 1,11° — (I/(O/O2-TIME OF INSPECTION: From: :co AM PM 4 70: ^ ^ 40 AM . Contact at cite: Yetzs » LtJllort OG YQ go A?5n /p .r► L , _I Inspection disclosed that the following sections were complied with: (Check all that apply) 1.51 - Notifications, Reports, Plan 1-71 - Air Sampling and Monitoring fl 1-91 - Worker Protection 1-101 - Materials and Equipment E] 1.116. Work Place Preparation 1-117 - Worker Decontamktation System fl 1.118 -Waste Decontamination System 0 1-126 -Engineering Controls 1-127 - Entry/Exit Procedures 1-129 - Maintenance of Barriers 1-138 -Encapsulation 1-139 - Enclosure 1-140 - Glovebeg 0 1-141 -Tent 1-137 -ACM Disturbance, Removal, .Handing 1-146 - Preliminary Clean-up 1-147 - Final Clean-up Project not started , Inspection revealed all ACM to be intact. New start date: / Project ongoing, expected completion date: / Project completed on or about: / . All surfaces, Including abated surfaces are free of visible ACM and encapsulate Follow up necessary on / / Samples taken: No O Yes 1 2 3 4 5 a Photos taken: O Yes No Additional comments: 4fr4 J lid I —, .rz le fi tom,-f i;. 1& 6~ rcz 3 Yom_ iQ t -

L - iQ f?1~~ FP~w o - cjJc* hoer Q' CN u Gt v'YI {fe° ~I ta: e&i4 O'✓t 4t €. QYI i 5

BORO I - MANHATTAN 2 - BRONX 3 - BROOOKLYN 4 - QUEENS 5 - STATEN ISLAND RESULT CODES 1 - VIOLATION ISSUED 2 - NO VIOLATION ISSUED 3 - NO ACCESS uNotuua 4 - PROJECT NOT STARTED (NO NOV) 5 - PROJECT COMPLETED (NO NOV) ? Q

NYC-WTC 000128483

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128483Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →