NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/127 FULTON STREET 1001266, 91/12
Document / 7 pages

Document label for 127 Fulton Street WTC debris file, 2002

Machine-extracted title · confidence 75%

Archival document label identifying records related to environmental cleanup at 127 Fulton Street following the World Trade Center collapse.

NYC-WTC_000127920–000127926

Folder label: “127 FULTON STREET 1001266, 91/12

Page image
Scanned page image, NYC-WTC_000127921
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION 11 .~ Asbestos Control Program 59-17 Junction Boulevard, 8°i Floor, Corona, NY 11368-5107 Building Dept. or TRU No J ~~rlr FOR OFFtCYU. USE QMX ASBESTOS PROJECT NOTIFICATION _1 .! I— A (ASBESTOS INSPECTION REPORT) 1. l) www.a C. ov/de TED (See ffe schedule)

When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities.

1. FACILITY

2. Address 127 Fulton St Borough Manhattan zip 1G`o36 AKA 42 Ann St, 3. Block 91 4. Lot 122

5. Type of FacIlity 6. Name of Building If. BUILDING OWNER

7. Name Collegiate Church Corp, 8. Contact Person DAvID 12I'I4M

9. Tel. # (212) 2334960 Fax #

10. Address 45 JO1It$ S1Ize'r City NY State lJY Zip 1CO36

III. GENERAL CONTRACTOR

11. Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name Benjamin Kurzban & Son Control 13. Contact Person Louie lannico

14. Federal Employer ID. # 15. Tel. # (718) 531-2900 Fax # (718) 209-1808

16. Address 1248 Ralph Avenue City Brooklyn State NY Zip 11236

V. THIRD PARTY AIR MONITOR

17. Name Warren & Panzwe Et 1 W E __jzs 18. Contact Person M id _Aer` NoLA4 19. Federal Employer ID. #_ _ _P _ _` 20. Tel. # (212) 922-0077 Fax # (212) 922-0630

21. Address 228 East 45th St y New York State NY Zip 10017

22. Sample Analysis Laboratory 23. NYS DOH ELAP #

VI. PROJECT INFORMATION 24. Starting date for this portion of work 08-22-0 2. Projected completion date a9_92- a2

Asbestos work schedule 19 Monday ® Tuesday IN Wednesday ® Thursday IN Friday Shift from: SOO ® am ❑ pm to 8`c' ❑ am ® pm If other, specify

Access to inspect the promises must be provided during the work schedule indicated in this Item.

25. Total amount of asbestos-containing material to be abated during this work T2er Square Feet, and/or 0 Linear Feet ACP 7 2/2001

NYC-WTC 000127921

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127921Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →