Document / 37 pages
Final Asbestos Report, 133-135 Greenwich Street, May 2005
Machine-extracted title · confidence 100%Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
NYC-WTC_000127657–000127693Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN”
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
PCM air sample results chain of custody, 200 Park Avenue · page 23 · Box DEP Box 36NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.982 (not a probability)
Invoice for asbestos work, 57 Ann Street, November 2002 · page 13 · Box DEP Box 47NYC-WTC_000119704
Invoice from Benjamin Kurzban & Son Control Inc. for asbestos removal work completed at 57 Ann Street in November 2002.
Similarity score 0.982 (not a probability)
Asbestos and lead survey report cover, 130 Cedar Street, July · page 221 · Box DEP Box 50NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Similarity score 0.982 (not a probability)
Unreadable document excerpt, 130 Cedar Street, 2001 · page 11 · Box DEP Box 50NYC-WTC_000125755
Document with unreadable text associated with the 130 Cedar Street site.
Similarity score 0.982 (not a probability)
Cover page for TEM results and chain of custody, 110 · page 78 · Box DEP Box 33NYC-WTC_000098346
Cover page for a report containing TEM results and chain of custody documents for airborne asbestos monitoring.
Similarity score 0.981 (not a probability)
OSHA air sample results chain of custody, 55 Church Street · page 94 · Box DEP Box 36NYC-WTC_000103467
Chain of custody documentation for OSHA-compliant air sampling and abatement verification at the hotel located at 55 Church Street.
Similarity score 0.981 (not a probability)