•V Nab+ J. & AWA LLW 'I Vl It ULL& b AU*. .
DEP will coordinate activities with building owners and other city agencies.
The sites and specific areas to be cleaned shall be determined and specified by the DEP.
The contractor shall restrict access by the public to the work area (s) during clean-up activities. Caution
tape and warning signs shall be used to identify work areas. Access shall be limited to the
contractor, his
employees, and Federal, State or local officials.
The contractor shall provide all necessary equipment, to remove, bag, transport, and dispose collected
waste. The contractor is responsible for supplying all necessary equipment.
The specific clean-up procedures for building roofs are attached. The DEP shall consider substitution of
the specified methodologies only if the request is received in writing. Any substitutions must receive
prior approval by the DEP.
For large asbestos clean-up projects, a partial decontamination system (changing room and shower) shall
be required at an entry/exit from each work area. A remote decontamination system shall be acceptable
with DEP on-site approval.
Contractor Oual flcations
The contractor shall have on staff and assigned to the,
certified workers. See above. contract a sufficient number of properly trained
and