NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 51/100 CHURCH ST 1001409, 125/20
Document / 31 pages

Cover letter from Management Corp, 100 Church Street, Oct 2002

Machine-extracted title · confidence 95%

Letter dated October 4, 2002 from Management Corp enclosing executed asbestos permit applications for 100 Church Street.

NYC-WTC_000126787–000126817

Folder label: “100 CHURCH ST 1001409, 125/20

Page image
Scanned page image, NYC-WTC_000126813
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document NYCDEP B+11 RSB/ hltw i rcu SEfl-13-2 2 15:39

fi1Qdiag Facade Clean' 1P .ti NYCDEP and NYSDOL asbestos contractor with Work shall be performed by a NYSDOL licensed asbestos certified workers. facades. should be experienced in cleaning building The caatraetor Performing the cleaning cleuan~ng shall ("specified area") by DEP. The area below the as ACM The clean up area shall be specified All debris must be collected be covered with a layer of pvlyethy es sheeting. ust bedouble bagged waste lsbe; eMd the surface. (i.e. directly upon, removal from is not water runoff on the building façade bags.) Runnug water or :ball 0d prior to e cleaning. Access to the street below the façade wind Building OMV with caution tape. Cleaning shall not be pe=rforms] during cleaning shall be restricted and marked speeds greater than 20 mph. =hall be Closed during the conditioners shall be turned off All windows scaling with duct tape to All HVAC systems and air conditioners and windows may requite cleaning of the building. Some or prevent water penetration. the roof; All clesn-up activities on the roof muse be where __..;'anent is rijzed from root: completed prior to rigging equipment from the ma st by wetting the facade sisal] be cleaned of large bulk All horizontal surfacer and all windows on non-metallic creepers, by wet wiping ~-metallic bristle brasher or wiping and low- and hand brushing or scraping with bottom. Only water shall be used for wet from top to hibited. or by HEPA vactnuniag solvents, additives, and any other chemical clesaaing agents wet pressure washing. Detergents, placed into containers (e.g. bags). Windows shall be The removed material shall be immediately during this procedure.Power for HEPA vacuums shall be wiped. Free running water shall not be evident supplied through ground fault interrupters. carefully washed. A low pressure washing of debris removal, the specified area shalltobem Facades abet] After completion t to employed inimize water bauace-byck. technique, moving from top to bottom, shall be 250 psi. exceed be washed with a low-pressure wash not to to of the abated surfaces and sidewalk shall be performed At the completion of work, a visual won verify the absence of visible debris. an inde peaftt NYSDOL licensed third party air Monitor i rm Air monitoring shall be performed by with certified workers. recomniendead this work minimize disruption to the public and to the building occupants, it is In order to be peribrrned during off-hours.

Page 5 05/03/02

NYC-WTC 000126813

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000126813Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →