NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 56 pages

Asbestos removal variance correspondence, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Correspondence regarding DEP acceptance of a variance package for asbestos removal at 130 Cedar Street.

NYC-WTC_000125698–000125753

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125732
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document 01/11/2005 01:42 17325653654 NOVA DEVELOPMENT GRP PAGE 15

Ax'LACffi+tENT R T5 REtsOTE 10081 Aldo W 5T8 DECOEQTAXTI01T Tr

AQI.BS OF TEL' C!TY O8 P.0) TITLE 2.5, C s"T88 1 al, vz, ,S T'0 VARIAIPCE 1-82(a) A8D 8 and 1-83 (a) ; [1& RCNY 8 NEW YORK g$CTXOWS 1-82 (a) outside the arm.. in unit shall be cO=fitruated .. i'be worker dggeontamination attached to indJ.vidual J.oveehag or wwka aae (or accordance with 15 RCNX 8 1-82, and to individual work areas. tests) or common space leading

least, 5. shower Z 1be remote each other by as airlock and from the31ovebag work area. a clean room separatd from

ordance with X9 RCTTY deeontamination unit shall be 3. The remote waste ucted ns t he su i n ae r. g2.oveba9 work 9 i-3, located outside the

acaordanee with 15 RCI T 1 1-94 decontamination units shall be maintained in , The (except sub-section b).

including gloves, hood and asbestos handler® Shall wear two disposable suits, street clothes in the g. All respirator? equipment, after removing footwear, and appropriate cicea room.

bagged waste shall {refer 15 RQT B 1-10 (af 15), the 6. After the ACM regovel• and bagging red outside the ptlovebag work area (or end trans be REWA-vaauwaed then wet cleaned wash room for wet washing, followed then moved to the tent) .for double bagging, and before loading for transportation. by storage in the holding aSea,

the outside glovebe►g work araa (or teat), shall cleaA 7. Each worker. before leaving the protecting clothing by wet cleaning end/or BEPA of the respiratozs and outer shall be removed in thQ work area and the vacuwniang. The outer disposable ®uit inner ag° anit and to the shower room. er workers shall then proceed to ~ ive bower oroughly before removing x d respirator shall be washed t h

the abatement be in place for the entire duration, of B. The decoftamiAatiof units shall activities.

with ia. to .use the gt mtst oe 9. The Following additional load ams remteddeoontam ►rder unite attached deocntaminatiOn ens to whiab the in the f l•, containment area S.) Final air a asanee must be schieved' astacbed. deecontamirmtion enclosure Systems are esaaotdaaee system shall be re-pinstioi.sed in ii) The decontamination eucleauxe with 19 RCNY S 1-82 and 0 3-83.

reviewed for future revision. BOTE This attacbmeast is being TSU/JM 6190

NYC-WTC 000125732

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125732Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →