NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
6 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗Correspondence regarding DEP acceptance of a variance package for asbestos removal at 130 Cedar Street.
NYC-WTC_000125698–000125753Folder label: “130 CEDAR STREET”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document B1 / 1'J/ lbbb 34:t4 if i bbb,bb4 NUVA 1JtVtLLH'MLN I IaKF' rM'.at UZ
ENVIRONMENTAL PROTECTION ~ ~ • THE Cmr OF NEW YORK DEPARTMENT oP David Tweedy, Acting Commissioner Robert C. Avsltroni Deputy Commissioner Bureau of Environment5l Compliance PHONE (718) 595-3714 FAX (718) 595-3648 / • DATE: r / TO: h1L REt VAR#
TRV/BN#
FACILITY ADDRESS:
Deer Applicant: This Form VI is an Approval. , note _____ 1. Your Variance Application has been delivered to DEP for consideration. Please btZf I echonts'~.f . cANCELLATION may occur as a result of the technica1/Regulatory and/or Pre-Abalz
2. An agreed Pre-Abatement Inspection has been scheduled as follows:
A. Day: MON. TUES. THURS. eA ~6h jf . Time: 0:00 a. 12: p.m 2:00 VxL Other:
Date: t7
L t4_- 0 • .
B. Applicant/Representative at the Facility /j
C. EXACT meeting place accessible at the NOTE: Arrangements must be in advance to ensure that areas affected by this variance application will be Will result- and delay time of the pre-abatement inspection. If you fall to do this, the Inspection wi'II not occur FOR ITEM 2 3. Item 2 could not be scheduled by you at this time. YOU ARE REQUIRED TO ARRANGE within 1 to 3 weeks or your application will be cancelled antomatica ft on if DEP/ALCP, 4. A pre-abatement inspection was not deemed to be necessary at this time, but you will be advised arranged during or after the technical review of your application, requires a pre-abatement inspection to be pending final approvals.
5. The non- lance phas the asbestos~x l k:~tb n date Indicated on ACP7. t ) IMPORTANT: ?1- f' ' t-€-'- " SHALL NOT 1. ABATEMENT ACTIVITIES THAT ARE SUBJECT OF YOUR VARIANCE ~TION COMMENCE PRIOR TO RECEIPT BY YOU OF'IHE DEP/ALCP/TRU WBr1TtN APPROVAL OF YOUR APPLICATION (via Form V2 or V3: Faxed to you or picked-up by you). NCEL THE 2. A CHANGE OF ASBESTOS CONTRACTOR BY THE OWNER SHALL AUTOMATICALLY CA VARIANCE APPLICATION, WHEN AN ASBESTOS CONTRACTOR IS THE APPLI
. . Signed D /ALCP/T cal Review Unit
File Form Vi 3/02 xc: 59-17 Junction Boulevard, 8e Floor, Corona, New York 11368-5107
NYC-WTC 000125699
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
6 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
9 shared non-person entities · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
12 shared non-person entities · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123541
Invoice from Asbestos Removal Corp dated August 6, 2002 for roof cleanup services at 29 Broadway.
8 shared non-person entities · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100474
Billing statement from a contractor detailing charges for environmental cleanup and facade work.
6 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123194
Invoice for roof asbestos abatement work completed at 198 Broadway covering nearly 25,000 square feet.
6 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000116315
Invoice from Asbestos Removal Corp to NYC DEP detailing costs for roof cleanup at 300 Albany Street.
3 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128146
Project notification form submitted to DEP regarding asbestos work schedules at 80 Gold Street.
7 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121883
Invoice from Fiber Control Inc. dated September 25, 2002, regarding work at the 116 Chambers Street site.
4 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112570
Invoice detailing costs for asphalt and gravel roof cleanup operations at 63 Wall Street in June 2002.
5 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115082
Permit application submitted by Benjamin Kurzban & Son Inc. to the DEP for roof work at 205 Pearl Street.
6 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000125069
A single-page record labeled for 130 Cedar Street with a unique NYC-WTC identifier.
Filed in the same folder
NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
Filed in the same folder
NYC-WTC_000125073
General notes and requirements for demolition work at 130 Cedar Street including contractor qualifications.
Filed in the same folder
NYC-WTC_000125076
Correspondence submitting updated asbestos project documentation to the DEP for 130 Cedar Street.
Filed in the same folder
NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Filed in the same folder