Document / 74 pages
Asbestos abatement technical specifications, 130 Cedar Street, July 2004
Machine-extracted title · confidence 100%Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
NYC-WTC_000125579–000125652Folder label: “130 CEDAR STREET”
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
P.A WTC C-81 Dey St Underpass Record, DEP · page 5 · Box DEP Box 44NYC-WTC_000165571
Administrative record or drawing reference for the World Trade Center Dey Street underpass project.
Similarity score 0.983 (not a probability)
Asbestos and lead survey report cover, 130 Cedar Street, July · page 215 · Box DEP Box 50NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Similarity score 0.982 (not a probability)
Chain of custody for air samples from 125 Water Street, · page 150 · Box DEP Box 53NYC-WTC_000129725
Custody form documenting the transfer and analysis of air samples collected at 125 Water Street in September 2002.
Similarity score 0.981 (not a probability)
Unreadable DEP document excerpt, undated · page 29 · Box GRM 010553089 - BOX 20NYC-WTC_000152717
Page containing garbled text and binary data from a Department of Environmental Protection document.
Similarity score 0.981 (not a probability)
Unreadable document, NYC WTC record, 19 pages · page 4 · Box DEP Box 51NYC-WTC_000126928
Nineteen-page document from the NYC World Trade Center environmental records collection with unreadable content.
Similarity score 0.981 (not a probability)
Asbestos Removal Invoice, 30 Wall Street, June 2002 · page 5 · Box DEP Box 40NYC-WTC_000112325
Invoice for roof cleanup services involving asphalt and gravel removal at 30 Wall Street dated June 30, 2002.
Similarity score 0.981 (not a probability)