NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 49/196 BROADWAY 1001219, 79/16
Document / 29 pages

Asbestos abatement invoice, 196 Broadway, Aug 2002

Machine-extracted title · confidence 95%

Invoice for roof asbestos abatement work completed at 196 Broadway covering over 32,000 square feet.

NYC-WTC_000123131–000123159

Folder label: “196 BROADWAY 1001219, 79/16

Page image
Scanned page image, NYC-WTC_000123146
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

,<cJ NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Program i i 1 c c W c 59-17 Junction Boulevard, 8"' Floor, Corona, NY.11368-51V7 Buftding Dept. or TRU No FOR OFFIGAL USE ONLY ONLY TYPE It ru :a?~`` ASBESTOS PROJECT NOTIFICATION FOR ! BE (ASBESTOS INSPECTION REPORT) 1. www. Yc,erleC . • A

~ n When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original ` S• signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week In advance of the start of abatement activkies .

1. FACILITY

2. Address (96 BROADWAY Borough MAN Zip

AKA 3. Block T9 4. Lot 16

5. Type of Facility (OMMEf;C* 6. Name of Building

If. BUILDING OWNER

7. Name 8. Contact Person

9. Tel. # Fax #

10. Address City State Zip

III. GENERAL CONTRACTOR

11. Name Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR 2SAW 4 Sds 13. Contact Person L OuIE %ANI31CO 12. Name a 33AMta Core-

14. Federal Employer ID. #,_ _ _ _._ _ _.PI I _.-15. Tel. # (.118) 531- 2900 Fax # C't 16 209-1806

16. Address 1246 RRtP1l AVENUE City BQ.00KLYN State Nib Zip 11236

V. THIRD PARTY AIR MONITOR

17. Name tua _._._ E._._E.at.C;.t.NIEERS B 18. Contact Person MtC.14AEt. NOL W p 19. Federal Employer ID. #L.--._._._.r....._._._._._._._._.i 20. Tel. # L212) 222 — 0017 Fax # (212)922 0630

4S -M City Nees Yc e.' State _l _ Zip tooth 21. Address 22S EAST —MiEC r

22. Sample Analysis Laboratory 23. NYS DOH ELAP #

Vi. PROJECT INFORMATION 24_ Starting date for this portion of work 1 0 Z Projected completion date Lo2.,

Asbestos work schedule 0 Monday ® Tuesday I Wednesday © Thursday © Friday ® Saturday ® Sunday St I dic Shift from: 8 ®am 0 pm to 8 ❑ am ® pm . If other, n specify N I Access to inspect the premises must be provided dwtng the work schedule Indicated in this Item. I AUG p 8 2002 25. Total amount of asbestos-containing material to be abated during this work OStE,0 ~tRAM 1t5 Square Feet, and/or _U Linear Feet r ACP 7 V2001 8V^`A~t , bs t 1~et5ta

NYC-WTC 000123146

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000123146Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →