NYC 9/11 Public Portal Document
AIRTEK Date: 12/11/01 Proj Num: 01-1213
ENVIRONMENTAL Page: 61
AIR SAMPLING RESULTS
CORP Code: FV
--Types of Project-- Address:EM&CA
53 PARK PLACE
State: Zip:
Date Analyzed: 12/12/01
Sample V -1211-19 FV -1211-20 FV -1211-21 FV -1211-22 FV -1211-23
I Location A,11TH FL.
T PII
IWA,11TH FL.
PT. ! PI1_
IWA,11TH FL.
PT. PII_
OWA,11TH FL.
HALLWAY BTWN
OWA,11TH FL.
HALLWAY ADJ.
ITCHEN BEDROOM LIVING ROOM kPT. PII ; & TO ELEV .
PII BANK A
______________
I
______________ ______________
______________
______
ctivity OST ABATEMENT POST ABATEMENT PAST ABATEMENT POST ABATEMENT POST ABATEMENT
Personal
vg Flow 15.0 15.0 15.0 15.0 15.0
al Date 2/11/01 12/11/01 12/11/01 12/11/01 12/11/01
rime On 6:48P 06:49P 06:50P 06:54P 06:55P
rime Off 8:48P 08:49P 08:50P 08:54P 08:55P
of Time 20 min 120 min 120 min 120 min 120 min
of Vol 800 ltr 1800 ltr 1800 ltr 1800 ltr 1800 ltr
I V Cnt
Fibr
Per Fld .06 0.065 0.04 0.03 0.02
ibr Cnt
Fibr
Per CC .0016 0.0018 0.0015 < 0.0015 0.0015
omments
ANALYSIS: NIOSH 74
Authorized Signatu
u
I
NYC-WTC 000120026
OCR can misread numbers and units. Confirm readings against the page image before using them.