Reference 118.0 574.4 521.5 300.3 299.6 114.3
Corrected
124363.5
2.412283 slope 4.953 9.3758 5.8028 41.603 10.312 3.1625
Equations to obtal nmass ofa phase tug) from Peak Area (if that phase Is assumed to be pse.sen8.
Alpha Quartz (Primary) ug = (Peak Area) /4.953 DL = 5 ug
Cristobalite (Primary) ug = (Peak Area) /L3758 DL = 20 ug
Tridymite (Primary) ug = (Peak Area) /5.8028 DL = 20 ug
Gypsum (Primary) ug = (Peak Area) /41.603 DL =10 ug
Calcite (Primary) ug = (Peak Area) / 10.312 DL = 20 ug
Portiandite (Primary) ug = (Peak Area) /3.1625 DL = 20 ug
NYC-WTC 000117590
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000117590Source: NYC Law Department, mirrored locally