3b. LOCATIONS OF ABATEMENT (Contfnuatlon of previous page)
AFFECTED SURFACES
.i%
/(,44(7(c f/
AMOUNT OF ACM
page
DESCRIPTION OF WORK BEING
of
DESCRIBE SECTION
Floor(s) OF FLOOR CONTAINING ACM PERFORMED
(e.g. entire. east wing, room #, (e.g. Pipe legging, ceiling, plenum SQu (e g. running cable, i stalling fire sprinklers.
boiler room lobby, etc) ducts, tanks, d etc FEET FEET and repladng boilers etc.)
2 Entire Debris Clean Up 12,000 Environmental Clean Up
ci
_ /aca __________
pV 29
NYC-WTC 000115824
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000115824Source: NYC Law Department, mirrored locally