An ACP7 form signed by the contractor and air-monitoring firm shall be submitted directly to the DEP
representative on site. The DEP shall 'notification to the NYS DOLL The size of the project,
provide
specified area, shall be indicated on the ACP7 form.. Building owners shall provide written authorization
to the DEP for the work activities.
DEP will coordinate activities with building owners and other city agencies.
The sites and specific areas to be cleaned shall be determined and specified by the DEP.
The contractor shall restrict access by the to the work area (s) during clean-up activities. Caution
public
tape and warning signs shall be used to identify work areas. Access shall be limited to the contractor, his
employees, and Federal, State or local officials.
The contractor shall provide all necessary equipment, to remove, bag, transport, and dispose collected
waste. The contractor is responsible for supplying-all-necessary equipment.
The specific clean-up procedures for building roofs areattached. The DEP. shall consider substitution of
the specified methodologies only if the request in writing. Any substitutions must receive
is
received
prior approval by the DEP.
For large asbestos clean-up projects, a partial decontamMation system (changing room and shower) shall
be required at an entry/exit from each work area. ,A remote decontamination system shall be acceptable
with DEP onsite approval.
Contractor Onalificatlons.
The contractor shall have on staff and assigned to the contract a sufficient number of properly trained and
certified workers. See above.