Document / 6 pages
Asbestos fiber analysis results, 113 Reade Street, July 2002
Machine-extracted title · confidence 95%Laboratory report from ATC Associates detailing transmission electron microscopy analysis of asbestos samples from 113 Reade Street.
NYC-WTC_000114419–000114424Folder label: “113 READE STREET Block: 145 Lot: 15 BIN: 1001585 AKA's: 101-107 West Broadway, 107 West Broadway”
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Invoice for roof cleaning, July 2002 · page 5 · Box DEP Box 45NYC-WTC_000114746
Invoice from Fiber Control Inc. for cleaning roofs at multiple Reade Street addresses.
Similarity score 0.985 (not a probability)
Invoice for roof cleanup services, Asbestos Removal Corp, July 2002 · page 11 · Box DEP Box 34NYC-WTC_000100816
Invoice from Asbestos Removal Corp detailing costs for roof cleanup at 114 Liberty Street.
Similarity score 0.976 (not a probability)
Invoice for roof asbestos removal, 63 Wall Street · page 6 · Box DEP Box 40NYC-WTC_000112570
Invoice detailing costs for asphalt and gravel roof cleanup operations at 63 Wall Street in June 2002.
Similarity score 0.972 (not a probability)
Invoice for fiber control services, 155 Chambers St, June 2002 · page 5 · Box DEP Box 51NYC-WTC_000127061
Invoice from Fiber Control Inc. dated June 24, 2002, for environmental protection program services at 155 Chambers Street.
Similarity score 0.972 (not a probability)
Asbestos fiber analysis report, 114-116 Fulton Street, June 2002 · page 2 · Box DEP Box 52NYC-WTC_000128830
Laboratory results for asbestos fiber analysis via TEM microscopy at 114-116 Fulton Street dated June 29, 2002.
Similarity score 0.972 (not a probability)
Asbestos fiber analysis cover sheet, 47 Ann Street, June 2002 · page 5 · Box DEP Box 47NYC-WTC_000119476
Cover sheet for a laboratory report on asbestos fiber analysis at 47 Ann Street dated June 2002.
Similarity score 0.969 (not a probability)