NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 45/12 PLATT STREET 1079051, 69/23
Document / 5 pages

Permit application for debris cleanup scope, vicinity of WTC, 2002

Machine-extracted title · confidence 100%

Application outlining compliance requirements and scope for follow-up visual assessments of debris on building exteriors near the World Trade Center.

NYC-WTC_000114357–000114361

Folder label: “12 PLATT STREET 1079051, 69/23

Page image
Scanned page image, NYC-WTC_000114358
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

An ACP7 form signed by the contractor and air-monitoring fine shall be submitted directly to the DEP representative on site. The DEP shall provide notification to the NYS DOL. The size of the project, specified area, shall be indicated on the ACP7 form.. Building owners shall provide written authorization to the DEP for the work activities.

DEP will coordinate activities with building owners and other city agencies.

The sites and specific areas to be cleaned shall be determined and specified by the DEP.

The contractor shall restrict access by the public to the work area (s) during clean-up activities. Caution tape and warning signs shall be used to identify work areas. Access shall be limited to the contractor, his employees, and Federal, State or local officials.

The contractor shall provide all necessary equipment, to remove, bag, transport, and dispose collected waste. The contractor is responsible for supplying all necessary equipment.

The specific clean-up procedures for building roofs are attached. The DEP shall consider substitution of the specified methodologies only if the request is received in writing. Any substitutions must receive prior approval by the DEP.

For large asbestos clean-up projects, a partial decontamination system (changing room and shower) shall be required at an entry/exit from each work area. A remote decontamination system shall be acceptable with DEP on-site approval.

Contractor Qualifications

The contractor shall have on staff and assigned to the contract a sufficient number of properly trained and certified workers. See above.

Page 2 05/03/02

NYC-WTC 000114358

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000114358Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Scope of Work Exhibit A, WTC Debris Cleanup · Box DEP Box 45

NYC-WTC_000115162

Exhibit A outlining the scope of work for debris removal at buildings near the World Trade Center site in compliance with federal and state regulations.

10 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 1.000

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →