10 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗Exhibit A compliance statement for WTC site visits, 2002
Machine-extracted title · confidence 90%Document outlining regulatory compliance and follow-up visual assessments conducted by DEP at buildings near the World Trade Center.
NYC-WTC_000111934–000111938Folder label: “18 VESEY STREET 1001234, 88/4”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Roof Clean-Up
Application: This procedure utilizes wet methods and careful hygiene protocol for cleaning roofs contaminated with asbestos containing material (ACM).
1. The entire roof shall be considered the work area for entry/access determinations. All abatement will be performed by NYSDOL licensed contractors with NYC DEP certified workers.
For non-gravel or stone covered roofs with localized accumulations of visible debris, the clean-up areas shall be specified ("specified area") by DEP.
For gravel/stone covered roof surfaces, the entire roof shall be included in the specified roof area for clean-up. The gravel/stone shall be taken to a clean-up staging area on the roof and washed. Water shall be collected, filtered, and discharged into the drain/sewer as applicable.
2. A changing area consisting of two adjacent step-off pads located on the roof immediately adjoining the roof entrance/exit. This area shall consist of a clean pad and a change pad. The clean pad shall be adjacent to the building interior access way (or at the point of entry to the roof for exterior access). The change pad shall be adjacent to the contaminated roof areas. Each pad (change pad and clean pad) shall consist of two layers of 10- mil reinforced plastic on the roof/access way surface and shall be large enough to facilitate changing and decontamination as described herein. A minimum of 4' x 4' is recommend, though the exact configuration will be specific to the roof.
3. Workers shall first step from the building interior (or exterior at the point of entry to the roof) directly onto the clean pad. On the clean pad, each worker shall be double suited with disposable coveralls, plastic booties, gloves, and head coverings. Rubber boots may be used instead of the plastic booties. The boots shall be wet wiped and HEPA vacuumed prior to leaving the roof. Each worker shall wear a minimum of a half-face air- purifying respirator equipped with HEPA cartridges.
4. All penetrations at the roof within 10 feet of the specified roof area included in the clean-up shall be cleaned by wet methods/HEPA vacuum and sealed with 6-mil polyethylene sheeting.
Roof cleanup shall begin at the entrance/exit and proceed in a path working away from the entrance/exit. Water shall be the primary engineering control to minimize the potential for fiber release.
Roof surfaces shall be wetted and then wet cleaned using wet wiping techniques with water, mops, rags, brushes, etc. HEPA vacuuming may also be used as alternative to or in combination with wet cleaning.
Throughout the procedure, all personnel entering or existing the roof shall observe the personal decontamination practices. Attention shall be paid to limiting unnecessary walking on or disturbance of material on the roof. These personal decontamination procedures shall be strictly adhered to, in order to minimize the potential for spreading contamination to the interior of the buildings.
8. Solid nonporous objects, such as metal patio furniture, plant potters, and plastic furniture cushions, shall be wet wiped with damp rags. Wooden objects such as decking shall be HEPA vacuumed, wet wiped, and lightly brushed with a bristle brush utilizing simultaneous misting and local HEPA exhaust. Woven materials shall either be disposed as ACM or bagged and removed off-site for proper laundering in accordance with 29 CFR 1901. 1001. Potted plants with visual contamination should be disposed as ACM waste unless the owner requests decontamination. Potted plants will be repeatedly rinsed, and provisions shall be made to catch the runoff water (i.e. into ACM disposal bags or by using rags and HEPA wet-vacuums).
9. After completion of the above, the specified area roof shall be carefully washed.
Page 3 05/03/02
NYC-WTC 000111936
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000113448
Letter dated August 8, 2002, submitting signed copies of the debris cleanup license agreement to the Department of Environmental Protection.
10 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000119189
Permit application outlining scope of work and regulatory compliance for cleaning debris from 22 Beaver Street.
10 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119225
Application outlining scope of work for cleaning exterior debris from 17 Battery Place in compliance with federal and state regulations.
10 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094422
DEP permit application defining scope of work and regulatory compliance for World Trade Center area debris cleanup.
10 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114344
Application outlining compliance requirements and scope for follow-up visual assessments of debris on building exteriors near the World Trade Center.
10 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099045
Exhibit A detailing regulatory compliance requirements and scope of work for debris removal at buildings near the World Trade Center site.
10 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150982
Contract excerpt defining regulatory compliance requirements and describing visual assessments of debris on building exteriors near the World Trade Center.
10 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114357
Application outlining compliance requirements and scope for follow-up visual assessments of debris on building exteriors near the World Trade Center.
10 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115162
Exhibit A outlining the scope of work for debris removal at buildings near the World Trade Center site in compliance with federal and state regulations.
10 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094321
Notary public document certifying the signature and authority of the DEP Commissioner to execute the preceding legal instrument.
10 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126102
Regulatory compliance document outlining scope of work for WTC debris cleanup operations and applicable federal, state, and local requirements.
10 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 18 Vesey Street · 5 pages · confidence 0.95 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Cited alongside this record in an Ask answer
NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
Cited alongside this record in an Ask answer
NYC-WTC_000104886
Fragmented text from a document describing asbestos abatement and cleanup procedures for the five-story building at 102-104 Greenwich Street.
Cited alongside this record in an Ask answer
NYC-WTC_000141922
McGraw-Hill construction and engineering trade publication; appears unrelated to 9/11 environmental records.
Cited alongside this record in an Ask answer
NYC-WTC_000144064
A single presentation slide from DEP Box 07 documenting the completion of excavation work at a site.
Cited alongside this record in an Ask answer