NYC 9/11 Public Portal Document
ASBESTOS INSPECTION (continued)
REPORT ))
26. Asbestos Hauler LO Qi /t W 0 NYS DEC -270 3& 7
Disposal Site(s) ;es .
PermUff
27. This asbestos abatement is part of a (Item a through a requires filing of this form with NYC Department of Buildings)
a) ❑ Demolition b) ❑ Boiler Replacement c) ❑ Sprinkler Replacement d) ❑ Renovation/Afteration
e) ❑ Fireproofing Replacement f) ❑ Other (Describe)
28. TYPE OF ABATEMENT (Check all appropriate boxes)
❑ Removal ❑ Enclosure 0 Encapsulation 0 Repair 0 Clean up
29. ABATEMENT PROCEDURE (Check all appropriate boxes)
❑ Full Containment ❑ Glovebag 0 Tent 0 DEP Variance Application
30. LOCATIONS OF ABATEMENT
DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING
Floor(s) OF FLOOR CONTAINING ACM PERFORMED
(e.g entire, east wing, room l, (e.g. Pipe lagging. ceiling. plenum SQUARE LINEAR (e.g nuwwng Cable, installing re sprinklers.
Ogler room, lobby. etc) ducts, stomge tanks. . etc.) FEET ' FEET remowig and replacing boilers, etc.)
ii 3-&)
iLL (S~
I
I
I
31. I hereby declare that the information provided herein is true and complete to the best of my knowledge. I am familiar with Federal,
State and NYC laws and regulations applicable to asbestos related work.
~~7S~i'r ~?cfati.tMtc 2i ,42377y c(4
P:mt N r ikon P ' Name stos Contractor Print Nam of App ant Ill other than Owner)
r
Signature naturo signature
OC- 03-0a Date Dee Date
32. 1 understand that as the owner of a building where asbestos abatement activity occurs, I am responsible for the performance of
the asbestos abatement activities in accordance with the Asbestos Control Program Rules. I have contracted the third party air
monitor who is completely independent of all parties involved in the asbestos project. I hereby declare that I have authorized the
lli of this notificat' r the wo specified herein.
rte- Z
Print Nana or r Sigruturo Date
A'STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.
Any modification of information provided on this form must be reported immediately in writing directly to the NYC DEP ACP
The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened 1]
through the performance of work in incremental or piecemeal fashion.
:Hoot
NYC-WTC 000111329
OCR can misread numbers and units. Confirm readings against the page image before using them.