NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 39/Zone I Originals
Document / 5 pages

Asbestos Project Notification Form, Corona NY

Machine-extracted title · confidence 95%

Formal notification of asbestos abatement activities submitted to the NYC DEP for a Corona site.

NYC-WTC_000111190–000111194

Folder label: “Zone I Originals

Page image
Scanned page image, NYC-WTC_000111194
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS INSPECTION REPORT (continued) 26. Asbestos Hauler LO` d -- _ NYS DEC Permit Tel Disposal Site(s) ©v I e2 P l,~eNces~~ ~'_____C ~=/ 27. This asbestos abatement is part of a (Item a through e requires filing of this form with NYC Department of Buildings) a) 0 Demolition b) 0 Boiler Replacement c) 0 Sprinkler Replacement d) 0 Renovation/Alteration e) 0 Fireproofing Replacement f) 0 Other (Describe) _--

28. TYPE OF ABATEMENT (Check all appropriate boxes) ❑ Removal ❑ Enclosure ❑ Encapsulation ❑ Repair ❑ Clean up

29. ABATEMENT PROCEDURE (Check all appropriate boxes) ❑ Full Containment ❑ Glovebag ❑ Tent ❑ DEP Variance Application

30. LOCATIONS OF ABATEMENT DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING Floor(s) OF FLOOR CONTAINING ACM PERFORMED (e.g. entire, east wing, room #, (e.g. Pipe lagging, ceiling. plenum SQUARE LINEAR (e.g. running cable, installing fire sprinklers. boiler room, lobb , etc) ducts, storage tanks, decking, etc.) FEET FEET removing and replacing boilers, etc.)

__F ______________

31. I hereby declare that the information provided herein is true and complete to the best of my knowledge. I am familiar with Federal, State and NYC laws and regulations applicable to asbestos related work.

jSCR Ar--(~1 4 r-t rat PrP / )1/ic c Pnnt N it tot Prin Name f Asb stos Contractor Pnnt Nam of App ant (If other than Owner)

Signature gnature Signature

Date Date Date

32. I understand that as the owner of a building where asbestos abatement activity occurs, I am responsible for the performance of the asbestos abatement activities in accordance with the Asbestos Control Program Rules. I have contracted the third party air monitor who is completely independent of all parties involved in the asbestos project. I hereby declare that I have authorized the filing of this notification for the work specified herein.

Print Name of Owner Signature Date

A STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.

I Any modification of information provided on this form must be reported immediately in writing directly to the NYC DEP ACP. The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened through the performance of work in incremental or piecemeal fashion. ACP7 212001

NYC-WTC 000111194

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000111194Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →