NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 39/Zone I Originals
Document / 10 pages

Asbestos Project Notification Form, Corona NY

Machine-extracted title · confidence 95%

DEP form notifying the department of an asbestos project at a Corona facility prior to abatement work.

NYC-WTC_000111145–000111154

Folder label: “Zone I Originals

Page image
Scanned page image, NYC-WTC_000111153
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document o,,, NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION any O Nee Asbestos Control Program (me ud ~)1.e 89-17 Junction Boulevard, 8" Floor, Corona, NY 11368-5107 ; . «& ASBESTOS PROJECT NOTIFICATION « ; een (ASBESTOS INSPECTION REPORT) 1, WOC.DE(~ X' D SRR US Reel se6 (Sqf toe ecrecse) When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original ° signatures are required. Submittal at the NYCOEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities . (. FACILITY 2. Address ale Vese-c STREET Borough N: MY Zip tosotF AKA 3. Block 4 i 4. Lot & 5. Type of Facility Resturant 6. Name of Building ll. BUILDING OWNER 7. Name CASTEG A— 90 VESEN SREET -° 8. contact Person 9. Te. AAD) “UT BO-VMESS caxt . 10. Address O-0 VESef STREET Git aX state_N): ¥zip LOCO T Ill. GENERAL CONTRACTOR 11. Name__" Tel. # (V. ASBESTOS ABATEMENT CONTRACTOR . 12. Name FiBek Cop Tko/ 13. Contact Person Tory Cos? 14. Federal Employer !D. # Pil 15. Tel. # glo ~ 26! ~3°00 Fax # SIG- 2SF-BKBS 16. Address 3010 Pvbus AY € City i) TAG A State N v Zip I? +3 V. THIRD PARTY 1) MONITOR 17. Name A a2 eae ES Pin Zee. ExGiners, PC__ 48. contact Person Michel Nou nn! . 19. Federal Employer ID. # 20. Tel. # 23 - 939 - O07 F__ Fax# HO - 9d -O6 30 21. Address ope] SEKT. UCtt STREET City Kew Taze. State (7 Zip [00 ( C- 22. Sample Analysis Laboratory SetMENTIE(S habe RATE 65, [ere 23. NYSDOH ELaP# 1/4 EO . Vi. PROJECT INFORMATION . 24. Starting date for this portion of work 7 | | 3| (oF) Projected completion date g | al | (e) 2 Asbestos work schedule Monday oO Tuesday oO Wednesday 0 Thursday O Friday O Saturday O Sunday 0) am CF pm to 0D) am 0 pm Shift from: If other, specify Access to inspect the premises must be provided during the work schedule indicated in this item. 25. Total amount of asbestos-containing material to be abated during this work 2300 | Square Feet, and/or_ = Linear Feet

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000111153Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →