NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 39/Zone I Originals
Document / 7 pages

Asbestos Project Notification Form, Corona NY

Machine-extracted title · confidence 95%

Permit application submitted to the NYC DEP regarding asbestos inspection and abatement activities.

NYC-WTC_000111138–000111144

Folder label: “Zone I Originals

Page image
Scanned page image, NYC-WTC_000111140
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

104 0 NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Program IfV ON t+pip 4 59-17 Junction Boulevard, 8' Floor, Corona, NY 11366-5107 Building or TRU NO FOR OF`FFII'CIAL USE ONLY

'"~t"rK:iio~ ASBESTOS PROJECT NOTIFICATION BE (ASBESTOS INSPECTION REPORT) fee schedule)

When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCOEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities.

I. FACILITY

2. Address k O S2 I. O n 1 PLEA' l~ S ~7^ 1 Borough t " f Zip (0 0 (3

AKA _ — 3. Block 1.. 9 4. Lot __________

5. Type of Facility_ 6. Name of Building

II. BUILDING OWNER

7. Name VI 1 ' V 44•_ 8. Contact Person I ^S

9. Tel. # (Z 1~ #

10. Address ~ 0 ~±`-e- SF —_ City __ N_ State(=1Zip

Ill. GENERAL CONTRACTOR

11. Name ---- ---- Tel. # --

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name e I'CO — _ -- _13. Contact Person _ /c ) __ _______ P11 14. Federal Employer 10. #j._._._._._._._._._._._. 15. Tel. # ~j67~1 - 3400 16. Address _3QL _-- City J L _[__ State V/ Zip IL?

V. THIRD PARTY AlAIR MONITOR

17. Name 2 ► Zr'~ NG r "le l~ S+ rC 18. Contact Person

19. Federal Employer ID. # _---- — 20. Tel. # aft=1a2 O0 _ Fax # .tea e2a —06 3 0

21. Address City L State [~_ Zip (00 / 22. Sample Analysis Laboratory C(f ((~tL G- t °x'«S J c 23. NYS DOH ELAP # _./ f iL

VI. PROJECT INFORMATION 24 Starting date for this portion of work 2 0 Z Projected completion date _2..j3O O Asbestos work schedule ❑ Monday ❑ Tuesday ❑ Wednesday ❑ Thursday 0 Friday 0 Saturday ❑ Sunday 1 / S 1TZ)% Shift from: ❑ am ❑ pm to ❑ am ❑ pm

If other, specify N

Access to inspect the premises must be provided during the work schedule indicated in this item. f

25. Total amount of asbestos-containing material to be abated during this work

15 ' Square Feet, and/or Linear Feet

1!P • t' ~p,•7~£f1rAL

P6fuP:.f.1 tpn

NYC-WTC 000111140

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000111140Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →