NYC 9/11 Public Portal Document
SEP-30-2002 12:33 NYCDEP BANHM ASBJLEAD TRU 718 595 3648 P.10
Roof CleanU
Application: This procedure utilizes wet methods and careful hygiene protocol for cleaning roofs contaminated
with asbestos containing material (ACM).
1. The entire roof shall be considered the work area for entry/access determinations. All abatement will be
performed by NYSDOL licensed contractors with NYC DEP certified workers.
For nongravel or stone covered roofs with localized accumulations of visible debris, the clean-up areas shall be
specified ("specified area") by DEP.
For gravel/stone covered roof atafaces, the entire roof shall be included in the specified roof area for clean-up.
The gravel/stone shall be taken to a cleanup staging area on the roof and washed. Water shall be collected,
filtered and discharged into the drain/sewer as applicable.
2. A changing area consisting of two adjacent step-off pads located on the roof immediately adjoining the roof
entrance/exit. This area shall consist of a clean pad and a change pad. The clean pad shall be adjacent to the
building interior access way (or at the point of entry to the roof for exterior access). The change pad shall be
adjacent to the contaminated roof areas. Each pad (change pad and clean pad) shall consist of two layers of 10-
mil reinforced plastic on the rooflaccess way surface and shall be large enough to facilitate changing and
decontamination as described herein. A mininuun of 4' x 4' is recommend, though the exact configuration will
be specific to thereof.
3. Workers shall first step from the building interior (or exterior at the point of entry to the roof) directly onto the
clean pad. On the clean pad, each worker shall be double suited with disposable coveralls, plastic booties,
gloves, and head coverings. Rubber boots may be used instead of the plastic booties. The boots shall be wet
wiped and HEPA vacuumed prior to leaving the roof. Each worker shall wear a minimum of a half-face air-
purifying respirator equipped with HEPA cartridges.
4. All penetrations at the roof within 10 feet of the specified roof area included in the clean-up shall be cleaned by
wet rnethods/HEPA vacuum and sealed with 6-mil polyethylene sheeting.
5. Roof cleanup shalt begin at the entrance/exit and proceed in a path working away from the entrance/exit.
Water shall be the primary engineering control to minimize the potential for fiber release.
6. Roof surfaces shall be wetted and then wet cleaned using wet wiping techniques with water, mops, rags,
brushes, etc. HEPA vacuuming may also be used as alternative to or in combination with wet cleaning.
7. Throughout the procedure, all personnel entering or existing the roof shall observe the personal
decontamination practices. Attention shall be paid to limiting unnecessary walldng on or disturbance of
material on the root These personal decontamination procedures shall be strictly adhered to, in order to
minimize the potential for spreading contamination to the interior of the buildings.
S. Solid nonporous objects, such as metal patio furniture, plant potters, and plastic furniture cushions, shall be wet
wiped with damp rags. Wooden objects such as decking shall be HEPA vacuumed, wet wiped, and lightly
brushed with a bristle brush utilizing simultaneous misting and local HEPA exhaust Woven materials shall
either be disposed as ACM or bagged and removed off-site for proper laundering in accordance with 29 CFR
1901. 1001. Potted plants with visual contamination should be disposed as ACM waste unless the owner
requests decontamination. Potted plants will be repeatedly rinsed, and provisions shall be made to catch the
runoff water (i.e. into ACM disposal bags or by using rags and HEPA wet-vacuums).
9. After completion of the above, the specified area roof shall be carefully washed.
Page 3
0S/03/02
SEP-30-2002 12 30 718 595 3648 99% P.10
NYC-WTC 000110863
OCR can misread numbers and units. Confirm readings against the page image before using them.