NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/No folder label
Document / 3 pages

Cleaning request form for Manhattan apartment, Sep 2001

Machine-extracted title · confidence 90%

Resident request for DEP apartment cleaning and monitoring work under federal disaster relief program with EPA oversight.

NYC-WTC_000108020–000108022
Page image
Scanned page image, NYC-WTC_000108021
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

fine china, decorative objects and works of art. Such efforts will include, at a minimum, either the removal of such items from the Residence prior to the beginning of the Cleaning Work or the securing of such items in sealed containers. I will identify in writing to DEP all fragile or valuable objects which cannot be removed or secured as described above so that provision may be made for their protection. The estimated value of such objects shall be indicated.

7. The Cleaning Work will be performed in all areas of the Residence unless I instruct DEP in writing to the contrary. As described in Section 16 of the attached document entitled "Cleaning Procedures for 125 Cedar Street", I will identify all items within the Residence which are to be cleaned. Items not identified for cleaning will be disposed of by the cleaning contractor. 23 T/'` /Z L° ,-4 F Cl D /( L G l~ .r -,.'L) r q/ 74 /3C 1 TRo rl~, N

8. The Residence may not be reoccupied until 48 hours after the conclusion of the Cleaning Work, as determined by DEP.

9. A copy of the air monitoring results will be provided to the Resident within 96 hours of the conclusion of the Cleaning Work.

10. Resident will be given an opportunity to walk through the apartment with the contractors prior to the commencement of the Cleaning Work.

11. A security guard will be posted at the main entrance to 125 Cedar Street throughout the duration of the Cleaning Work in the Building.

12. By signing this Request Form, I am not waiving any claims with regard to the safety or habitability of the Residence, even after the completion of the Cleaning Work.

13. I recognize that the Clearance Criteria to be used to determine when the Cleaning Work has been completed are those that have been established by EPA for cleanup activities resulting from the collapse of the World Trade Center. The Clearance Criteria are set forth in the "Monitoring Contractor - Scope of Work for 125 Cedar Street, Manhattan" at page 4.

SIGNATURE:

NYC-WTC 000108021

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000108021Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →