000106189
H.A. Bader Consultants, Inc.
88 Bleecker Street, Suite 4E
New York, New York 10012
(212) 475-4122
DATE
2001
10/19
10/9
101,9
101,9
101,9
10/,9
SAMPLE LOCATION
Basenent Lounse
Basenent office
IST Floor
Ind Floot
3rd floo
ith Flod
Fieid Blank
PUMP
NUMBER
33
28
62
13
30
PROJECT NAME:_
DC 37
PROJECT ADDRESS:-
115
Chambers Street, Ny, Ny
TAKEN BY:_
HA
ASBESTOS AIR SAMPLING
SAMPLE
NUMBER
DI
FLOW RATE
(L/MIN)
10
10
10
A4
A5
Alo
10
10
10
START
TME
STOP
TIMER
TOTAL
TOTAL
VOLUME
4
1332 15421351350
1333
1548135
1350
i307
(Is42ISS I550x)
1312 1543151|1510X
1318 1544146|1460x
132515491401400
X
X
X
X
A = Air Sampling
M = Micro-Vacuum Sampling
1 = Inside Work Arca
O = Outside Work Area
P = Pre Air Sampling
B = Baseline/Ambient
S = Preparation
R = During Removal
C = Cleanup
F = Final Air Test
E = Pumps Calibrated al Starl/Finish
Page
MAR-04-2002 MON 01:04 PM REAL ESTATE DEPT
FAX NO. 212 815 1441
P. 07
NYC 9/11 Public Portal Document
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000106189Source: NYC Law Department, mirrored locally