FEB-25-2002 18:00 HYGIENETICS NYC 212 244 8505 t'.u1r21
H gienetics
Environmental ..
Hygienetios Environmental Services, Inc. I West 34th Street ITho e. (212) 244-3443
7th Floor Fax. (212) 244-8505
New YO(K, NY 10001
September 18, 2001
via Fax
Ms. Peggy Nash
983-9563
General Manager (212)
Leasing & Management
170 Broadway-Suite 412
New York, New York 10038
Re: 170 Broadway Clean-Up
Dear Ms. Nash:
Dept. of
Based on an earlier telephone conversation with Mrs. Norma Richardson (NYC
Inc. (Hygienetics) recommends
Environmental Protection), Hygienetics Environmental Services,
order to facilitate the re-occupancy of
that the following sequence of events should be followed in
building employees and tenants:
present (>1.0% asbestos
1) For the areas where bulk sampling has indicated that asbestos is
content) or are assumed to contain asbestos materials, a New York State Licensed Asbestos
Abatement Contractor should be retained to properly address these areas. Air sampling must
be performed by a third party in accordance with Title 15 (RCNY).
Asbestos Abatement Contractor.
2) All HVAC filters will be removed and disposed of by an
New filters shall be installed with the air being recirculated (no fresh air intake) prior to
Contractor. At this time a walkthroughtvisual
demobilization by the Asbestos Abatement
there has been no additional releases of bulk
inspection will be performed to insure that
Asbestos Abatement Contractor can address these
materials from the IVAC system. The
The need for additional air sampling will be
areas as needed prior to demobilizing.
further clean-up activities performed by the Asbestos
determined by whether or not there is
Abatement Contractor.
dust, and bulk samples have
3) For the areas where there has been minimal accumulations of
cleaning contractor may be used as
been reported as note-asbestos-containing, a traditional
cleaning contractor
long as "wet methods" and/or HEPA equipped vacuums are utilized. The
has demobilized. The
will perform all activities once the Asbestos Abatement Contractor
intake).
HVAC equipment will continue to recirculate air (no fresh air
4) HVAC equipment can then be run at normal conditions.
Areas to be •addressed by the Asbestos Abate nment Contractor:
A.) Suite 1506 E) Exterior Window Sills
13) Suite 800 F) Suite 308 (10' x 10' treatment Room)
C) Suite 1411 C) Suite 1206 (Empire Capital)
D) Exterior Roof H) Areas not visually assessed during our initial
inspection
7671 °ate
Post-ita Fax Note 4/5 Ip s
To . From j
~'~9f~XIGfS K
Co H,~.cs~lris 0 4111
4
Pr .ne k -_"'€
NYC-WTC 000105760