Document / 126 pages
Asbestos cleanup document excerpt, 102-104 Greenwich Street
Machine-extracted title · confidence 70%Fragmented text from a document describing asbestos abatement and cleanup procedures for the five-story building at 102-104 Greenwich Street.
NYC-WTC_000104886–000105011Folder label: “102 GREENWICH STREET Block: 53 Lot: 37 BIN:1001054 104 Greenwich Street”
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Asbestos inspection report, 45 Park Place, undated · page 1 · Box DEP Box 45NYC-WTC_000115850
Report documenting asbestos sampling locations and inspection results for the 45 Park Place building.
Similarity score 0.940 (not a probability)
Invoice for Facade Services, 179 Broadway, Aug 2002 · page 9 · Box DEP Box 49NYC-WTC_000122774
An invoice from Fiber Control Inc. dated August 2002 for facade services performed at 179 Broadway.
Similarity score 0.939 (not a probability)
Asbestos inspection report form, Duane Street, 2002 · page 1 · Box DEP Box 51NYC-WTC_000126172
Formal record documenting asbestos inspection results and building details for a World Trade Center vicinity property.
Similarity score 0.938 (not a probability)
Building inspection form for 179 Broadway regarding asbestos and air · page 4 · Box DEP Box 49NYC-WTC_000122818
Form documenting building details and inspection results for asbestos-containing materials and air monitoring at 179 Broadway.
Similarity score 0.937 (not a probability)
Asbestos inspection report form, 15 Park Row · page 1 · Box DEP Box 45NYC-WTC_000115685
Form titled Asbestos Inspection Report for 15 Park Row containing fields for inspector and contractor details.
Similarity score 0.937 (not a probability)
Invoice from Fiber Control Inc., August 2002 · page 6 · Box DEP Box 49NYC-WTC_000122622
Invoice from Fiber Control Inc. dated August 28, 2002 for services at job sites listed.
Similarity score 0.936 (not a probability)