NYC 9/11 Public Portal Document
HILLMANN ENVIRONMENTAL GROUP LLC
I DAILY PROJECT BOOK
(PLEASE USE ONE BOOK PER JOB NUMBER, PER DAY)
I
illmann Technician HECO Job #______________
Hillmann Project Manager Noh Today's Date 9/ 2°i 101
1tart Date --
Projected Completion Date 19 1Z° /OI
ent (` m
f orIcation 1c
-I
•pecific Location (i.e. 1 St floor, etc.)
kx.4 Jai
Gr r ,vykj-, St NY
Contractor
Ak-
- •.
Client Job Number (if applicable)
PLEASE CHECK THE TYPE OF MATERIAL TO BE REMOVED
MAKE SURE YOU ALSO Flu. IN THE QUANTITY OF MATERIAL AND METHOD OF ABATEMENT
SURFACING TSI
ANTITY TYPE QUANTITY TYPE METHOD
(LF. SF) TentfGbvebag. eta) (LF. SF) (FC. Tent/GIovebag. eta)
1------- Cemetit'
ra On
EVT
Insulation
I <) Other: Boiler Wrap
Other
It
MISCELLANEOUS
LLF)
1ANTITY TYPE METHOD
(FC. T etc)
QUANTITY
(SF. LF)
TYPE ETHOD
(FC. Tes lovebag, etc)
VAT Caulk'
Mastic oofin
Trans' )Flashing
(_) board— ( ) Other:
( Molding
s
$lllmann Technics natur
Is Is the property of Hillmann Environmental Group, LLC.
f
I
NYC-WTC 000105006
OCR can misread numbers and units. Confirm readings against the page image before using them.