NYC 9/11 Public Portal Document
HILLMANN ENVIRONMENTAL GROUP LLC
DAILY PROJECT BOOK
I (PLEASE USE ONE BOOK PER JOB NUMBER,PER DAY)
almann Technician S(/Pr HECO Job # 'i1- 361&1
Ilmann Project Manager / 4Ake. Today's Date 12 /2.0 /0 L
art Date - Projected Completion Date
Contractor_________________
dent
_ocation
tecific Location (i.e. jst floor, etc.)
Client Job Number (if applicable)
PLEASE CHECK THE TYPE OF MATERIAL TO BE REMOVED
MAKE SURE YOU ALSO FILL IN THE QUANTITY OF MATERIAL AND METHOD OF ABATEMENT
I
SURFACING TSI
L rrTY
(I.F. SF)
TYPE METHOD
(FC. Tentrjlm bag, etc.)
QUANTITY
(LF. SF)
TYPE METHOD
(FC. TentlGbvebag, etc.)
etitious VT
S ra On Pipe Insulation
( ) Other. Boiler Wrap
Other:
I
MISCELLANEOUS
TYPE METRO QUANTITY TYPE M ID
OF.In (FC. T ebag, eta) (SF. LF) (FC. Tent/Gloveebag. eta)
VAT Caul
Mastic oofin
I — > t te
Baseboard (
Flashing
) Other:
Molding
L imanu Tech an' Signa re
s Is the pr arf Imann Environmental Group, LLC.
I
NYC-WTC 000104986
OCR can misread numbers and units. Confirm readings against the page image before using them.