Scope of work document for 114 Liberty Street interior cleaning,

Machine-extracted title · confidence 95%

Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.

NYC-WTC_000102620–000102631

Folder label: “SCOPE OF WORK ADDENDUMS WORK SCHEDULE

Page image
Scanned page image, NYC-WTC_000102623
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(19) All equipment used for cleaning activities shall be vacuumed and/or wet wiped prior to removal from the work area.

(20) The project monitor shall perform a thorough visual inspection to verify the absence of visual dust accumulations. Additional clean-up procedures shall be performed where visible dust is observed.

(21) Upon successful visual inspection, the work area shall be isolated from the remainder of the work site pending clearance monitoring. Clearance monitoring shall be performed after completion of all clean up activities at the work site.

(22) The Technician(s) shall perform clearance sampling after the area is free of dust accumulations as determined by the Project Monitor. The apartment will be re-cleaned and retested if the clearance criteria are not achieved. The Contractor is responsible for the costs of re-cleaning associated with failure to meet the clearance criteria. The clearance air monitoring criteria have been established by the USEPA for this clean up activity (WTC Vicinity). The clearance criteria are as follows:

Parameter Clearance Level Note Asbestos in air 0.0009 f/cc PCMe Primary clearance level Lead in settled dust <25 fl2 Primary clearance level Dioxin in settled dust <4 ng/m2 Primary clearance level Fibrous glass in air <0.01 f/cc Secondary clearance level Crystalline silica in air 1 m3 Secondary clearance level PAHs in settled dust <0.3 mg/m mg/rn2 Primary clearance level

(23) After successful clearance monitoring, isolation barriers shall be removed in accordance with the applicable requirements of Title 15, Chapter 1 of the RCNY.

(24) The cleaning contractor is not responsible for damage or loss caused by the acts of parties not involved with the cleanup. Resident shall be responsible for the removal of any valuables. If such removal is not feasible, the resident shall notify the Project Monitor in writing (including original receipt, formal appraisal, or estimated value) as to the location, description and value of said item.

(25) Disposal of all wastes generated during the cleaning shall be the responsibility of the contractor. All waste generated shall be treated as asbestos-containing material (ACM) with the exception of items that can be cleaned prior to disposal. As specified above, large items may be cleaned and disposed as non-regulated waste with prior authorization by the Department. Transportation and disposal of generated waste shall be in compliance with all applicable rules and regulations.

(26) All work shall be in compliance with all other applicable requirements of Title 15, Chapter 1 of the RCNY.

(27) The following table contains special conditions and handling instructions for items in specific units. Items not specifically referenced in this table shall be handled in accordance with the procedures specified in this scope of work and in written documentation provided by residents via DEP.

4 of 5 2/7/03

NYC-WTC 000102623

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102623Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →