NYC-WTC_000117805
Invoice from Fiber Control Inc. for cleaning a gravel roof at 2 South End Avenue totaling $59,883.10.
8 shared non-person entities · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗Transmittal letter from ETS Contracting to DEP submitting close-out documentation for 114 Liberty Street dated April 21, 2003.
NYC-WTC_000101404–000101670Folder label: “CLOSE OUT PACKAGE FOR 114 LIBERTY STREET NEW YORK, NY PART II”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Page 1 of I Personal Air Monitoring Airborne Fibers
Clients ETS Contracting, Inc. Nikon Labophot PCM FINAL-AIRE Projects Serial No.: 241205 EnvironmentalConsultants Address/ 114 Liberty Street Field Areas 0.00785 mm2 Project Location All Floors Filter Areas 385 mm2 Date Sampleds 03/09/03 PO Nos Method: NIOSH 7400A" TIC :7181 646.0925 Date Received: 03/12/03 Job Nos 1286/03 ELAP ID No.: 11228 Fax, x17181646.0925 Date Analyzed: 03/12/03 Rotometer Nos.
I ID Type Volumo(L) Flow Ipm Individual Social Security No Activity Respirator Fibers /Field 8hrTWA f/cc 6XC f/cc
I 01 02 !XC PRS 75/2.5 1152/2A 1 PREP PREP HM HM 0.160 0.235 0.010 0.10
P1 03 04 PRS PRS 1152/2A 1176/2.45 PREP PREP NM HM 0.280 0.325 0.012 0.014
05 PRS 1152/2.4 PREP HM 0.185 0.008
J 06 07 ELK ELK 0.015 0.010
I I I I r
Final-Aire is responsible for only the fibers per field as described in NIOSH 7400
I Comments: Sampled by: Jawien Marian Fiber Range Relative Standard Deviation 1-20 0.32 Analyzed by: Nicholas Anastasakos 21-50 0.17 51-100 0.12 Approved by:
H >100 0.08 EXC: F,xcorelon Limit HM: Half-Face FF: Fnll-Face. PAPR: Powered Air PRS: Personal ENV; Environmental CL: Clearance WP: Wet Wipe Technical Director
C REM: Cross Removal GLB: Gloveba CLN: Cleaning BRE: Bog Removal T: Tronsite
I 3051 East 24th Street, Brooklyn, NY 11220
NYC-WTC 000101421
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000117805
Invoice from Fiber Control Inc. for cleaning a gravel roof at 2 South End Avenue totaling $59,883.10.
8 shared non-person entities · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123131
Invoice for roof asbestos abatement work completed at 196 Broadway covering over 32,000 square feet.
8 shared non-person entities · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127657
Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
3 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095331
Chain of custody form documenting bulk sampling and air monitoring at 375 South End Avenue on November 17, 2001.
9 shared non-person entities · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130855
Invoice from Asbestos Removal Corp for roof cleanup services at 40 Exchange Place dated September 18, 2002.
7 shared non-person entities · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112389
Invoice from an asbestos removal contractor detailing roof cleanup services performed at 45 Wall Street in September 2002.
9 shared non-person entities · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114261
Invoice from Benjamin Kurzban & Son Control Inc. for asbestos abatement and cleanup at 12 Platt Street.
8 shared non-person entities · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108177
Single-page document containing identification codes and file references for World Trade Center environmental records at 120 Liberty Street.
8 shared non-person entities · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104556
Letter from Paramount Group dated May 2, 2002 enclosing air and bulk sample reports for 77 Front Street.
6 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127695
Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
3 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119863
Document tracking environmental samples collected from 365 South End Avenue on October 17, 2001.
8 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Invoice from Fiber Control Inc. for cleaning a gravel roof at 2 South End Avenue totaling $59,883.10.
Similar indexed content
Similar indexed content
NYC-WTC_000123131
Invoice for roof asbestos abatement work completed at 196 Broadway covering over 32,000 square feet.
Similar indexed content
Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
Similar indexed content
NYC-WTC_000095331
Chain of custody form documenting bulk sampling and air monitoring at 375 South End Avenue on November 17, 2001.
Similar indexed content