NYC 9/11 Public Portal Document
ASBESTOS INSPECTION REPORT (continued) 0
- 1 A
26. Asbestos Hauler - Co NYS DEC "ermit
Disposal Site(s) .eN;e5 r \Ii4-
27. This asbestos abatement is part of a (Item a through a requires filing of this form with NYC Department of Buildings)
a) 0Demolition b) 0
Boiler Replacement c) 0
Sprinkler Replacement • d) ❑ Renovation/Alteration
e) ❑ Fireproofing Replacement q 0 Other (Describe)
28. TYPE OF ABATEMENT (Check all appropriate boxes)
❑ Removal ❑ Enclosure ❑ Encapsulation ❑ Repair ❑ Clean up
29. ABATEMENT PROCEDURE (Check all appropriate boxes)
❑ Full Containment ❑ Glovebag Tent 0
❑ DEP Variance Application
30. LOCATIONS OF ABATEMENT
DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING
Floors) OF FLOOR CONTAINING ACM PERFORMED
(e.g entire, east wing. room 0. (e.g. pipe tagging, cefnD. pbnum SQUARE M EN (e.g. sunning cable, ttstaning fro apmklem.
boder room. lobby, etc) ducts, tanks. dedtinq. etc.) ET • FEET ' and boilers. et
Qtj I_(iprLk)
1
I
I
31. I hereby declare that the Information provided herein is true and complete to the best of my knowledge. I am familiar with Federal,
State and NYC laws and regulations applicable to asbestos related work.
c E
a Pnftt itor Name Canbactor Print Na . d App M (N other than Owner)
t
Sgnature naturo SiDnatur'e
Date
-3-c Date Date
32. I understand that as the owner of a building where asbestos abatement activity occurs. I am responsible for the performance of
the asbestos abatement activities in accordance with the Asbestos Control Program Rules. I have contracted the third party air
monitor who is completely independent of all parties Involved In the asbestos project I hereby declare that I have authorized the
filing pf this notification for the work specified herein.
fR`Prdt Named owner
_______________ Signature I Date
A STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.
An modification of information provided on this formmustbereportedimmediately In writing
writingdirectly to the NYC DEP ACP.
The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened
throuqhtheperformanceof work in incremental or piecemealfashion.
through J Ate
srmot
NYC-WTC 000100468
OCR can misread numbers and units. Confirm readings against the page image before using them.