NYC-WTC_000134445
Inspection form recording facade assessment results for the building at 137 Greenwich Street.
3 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗Revised invoice from Fiber Control Inc detailing costs for facade cleanup services at WTC site locations.
NYC-WTC_000100148–000100151Folder label: “41 MURRAY ST 1001445, 133/7501”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
WTC Visual Survey Form premise Address: l3
Block: ResidentialEl Commercial JJ Name of Building: Lot: Mix Use9 Other q L4 7 501 # of Stories: AKA's: Building Owner/Management Telephone Number. Name: FAX: Address: On Site Contact Name: - ' Telephone Number: Building Owner Management Activities Interior Survey Performed 0 Yes Q No Exterior Survey Performed ❑ Yes No General Clean Up ❑ Yes 0 No Locations: ACM Clean Up ❑ Yes 0 No Locations: Air Monitoring [] Yes 0 No Locations: Copies of All Reports and Data Requested Yes Visual Inspection Results: Facade: Inspected Debris North ❑ NIA ❑Yes 0 No 0 No Vsible/Fine Layer h to 1' 9>1' South- 9 N/A Yes 0 No 0 No Visible/Fine Layer % to 1" 0>1' East j N/A 9 Yes 0 No 9 No Visible/Fine Layer 9 % to 1" 0>1' West 9 N/A DYes 0 No 9 No Visible/Fine Layer 9 Ya to 1" ❑> V Facade Description:
Roof ~,►st Debris: Q No Visible /Fine yer 9 a to 1" 1 =~'"'~ 9> V I Description: 'i S ~c z <(- 3 7ti1t, P-4A —+y
Setbacks WA j) Floor. Debris: El No Visible/Fine Layer 9 % to 1' 9>1' Floor. Debris: 0 No Visible/Fine Layer h to 1" ❑ >1' Floor____ Debris: No Visible/Fine Layer Va to V [] >1' Floor. Debris: No Visible/Fine Layer Floor____ Debris: No Visible/Fine Layer i4 to 1" % to 1" 8 > 1' > 1' Comments
Date: OL/i_/2002 Inspection Team: Name: 1fit Agency: Name: __ !a,r~ c r; Agency: I
NYC-WTC 000100149
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000134445
Inspection form recording facade assessment results for the building at 137 Greenwich Street.
3 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122255
Blank or partially filled asbestos inspection report form used to record site details, contractor information, and sample numbers.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134592
A Department of Environmental Protection form recording facade and ACM inspection results for a building at 292 Greenwich Street dated February 12, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126241
Inspection form documenting the assessment of World Trade Center debris on building exteriors including facade and air monitoring checks.
3 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127861
Inspection form documenting facade surveys and hazardous material assessments for a building near the World Trade Center site.
3 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122616
Inspection form recording facade and roof conditions at 174 Broadway regarding asbestos and WTC debris presence.
3 shared non-person entities · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113344
Inspection form for 45 Warren Street requesting data on ACM presence, air monitoring, and facade debris.
3 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118055
Inspection form recording results of facade and roof assessments for hazardous materials like asbestos at 47 Broadway.
3 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112987
February 12, 2002 letter from DEP requesting environmental hazard assessments for 68 Warren Street following WTC collapse.
3 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122977
Supplemental report on north facade cleanup at 182 Broadway documenting a water leak incident from a fire hydrant.
4 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121956
Form recording visual inspection results of facades and setbacks for foreign material debris at the specified location.
3 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122110
A blank or partially filled form for recording asbestos inspection details at a building on Chambers Street.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000115922
Letter instructing building owners to assess and clean up visible World Trade Center debris at 43 Park Place.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115755
Inspection form recording visual results for facades and setbacks at a building in the WTC area.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134086
A twelve-page form documenting building details, management contacts, and asbestos or air monitoring inspection results for 133 Greenwich.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100163
Documentation form for the disposal and tracking of asbestos waste generated at the World Trade Center site.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130698
Inspection form recording facade conditions and air monitoring results for 181 Duane Street.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121949
Inspection form recording visual results of facade and setback areas for foreign material debris at the specified location.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Filed in the same folder
Filed in the same folder
NYC-WTC_000100134
Invoice from Fiber Control, Inc. for environmental protection services performed at 10-12 Cortland Street.
Filed in the same folder
Invoice from Fiber Control Inc for facade cleanup services performed at multiple WTC vicinity sites.
Filed in the same folder
Filed in the same folder