NYC 9/11 Public Portal Document
-,,.~ ~•" !!.1 ALt1WLL.dN E A — SCOPE OF WORK
Dust/Dirt/Debris Suspect WTC-Related Dust
d
Estimate % of total dust
•
loading
C System Light Heavy
Component (<1/l6 inch (2 1/16 inch Present?
System Components . Substrate Material None depth) depth (Y/N)
Outside air intake louvers, grates
and/or screens '
Outside air duct
Outside air damper(s)
Return air grilles' .
Return air plenum .
Return air plenum damper
Return air ducts
Turning vanes -
Mixing chambers .
Filter rack(s)
Filter banks/media
Pre-heat coils
Cooling coils
Re-heat coils
H urnidification and/or aircleaning
.equipment
Fire dampers
In-line re-heat coils
Acoustical blower housing lining I
-
Duct connectors
Blower assembly including blower
wheel, blower housira, air vanes, in- _. .
line noise artenuators, acoustical .
treatments (e.g. baffies, duct linings)
Condensate drain pan
Condensate accumulator
Supply air plenum
Supply air plenum dLrnper(s)
Supply air ducts
-High pressure -main trunk
-Low pressure — branches
Supply plenum or supply duct
linings
Supply air duct damper(s)
Supply air diffusers I I
Terminal-boxes
Open or ducted passive ventilation
shaft(s) .
Other Information:
Unit cycled prior to inspection I Color ofDust/Dirt/Debris I
❑ Filter loading (general impression) I fJ )Pater damage
❑ Filter bypass (describe) l Visible suspect mold growth
I
❑ Abraded' ela nmated acoustical lining
jEvidence of animal incursion (carcasses, feathers, fecal
matter)
NYC-WTC 000099517
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000099517Source: NYC Law Department, mirrored locally