Samples, readings and decisions over time
Candidates extracted by machine can misread scans. Dates, substances, values and labs below occur on the same page; their relationship is not established — a value shown is a number found on the page, not a confirmed reading. Verify the page.
No test candidates in this selection.
Documents for this building
10 documents across 1 box, grouped by what each document is. Titles and summaries are machine-written; the page image is the authority.
Chain of custody · 5
Chain of custody form detailing the collection and handling of PCM air samples at the World Trade Center site.
2 pages · no date extracted · Environmental Protection, Dept. of · Box — · matched page 1Chain-of-custody form for PCM air samples collected at various WTC area locations in March 2002.
3 pages · no date extracted · Environmental Protection, Dept. of · Box — · matched page 3Document page containing the letterhead of an environmental consulting services firm.
3 pages · no date extracted · Environmental Protection, Dept. of · Box — · matched page 3Chain-of-custody for Pre-Abatement/inside area PCM sample at Riverpoint project.
3 pages · no date extracted · Environmental Protection, Dept. of · Box — · matched page 2Chain-of-custody for Riverpoint, Inc. sample handling; NYC address.
3 pages · no date extracted · Environmental Protection, Dept. of · Box — · matched page 3Unclassified · 5
Record of air sample collection and chain of custody details for World Trade Center site asbestos monitoring in early 2002.
3 pages · no date extracted · Environmental Protection, Dept. of · Box — · matched page 3Form recording the chain of custody for air samples collected at the World Trade Center site for asbestos fiber analysis in March 2002.
3 pages · no date extracted · Environmental Protection, Dept. of · Box — · matched page 3Riverpoint PCM air sample analysis; final phases and contractor details.
3 pages · no date extracted · Environmental Protection, Dept. of · Box — · matched page 1PCM air sample form with job name and work area.
3 pages · no date extracted · Environmental Protection, Dept. of · Box — · matched page 3Riverpoint project documentation for WTC site; client and location details.
4 pages · no date extracted · Environmental Protection, Dept. of · Box — · matched page 1Related buildings on the same block
Block-lot keys and present-day footprint joins; not a reconstruction of 2001 buildings.
No same-block matches established by this place’s block-lot key or present-day footprint join.