100 TNNITY PLACE
Machine-extracted address · confidence 0.55 · verify source page
Activity by month
| Month | Pages |
|---|---|
| Jan 2002 | 1 |
| Feb 2002 | 2 |
| Mar 2002 | 1 |
| May 2002 | 1 |
Tests over time
Each dot is a day on which a test candidate page names that substance for this building; bigger dots mean more pages that day. Dates and substances are machine-extracted from the page, and a dot is a page, not a result.
Samples, readings and decisions over time
Candidates extracted by machine can misread scans. Dates, substances, values and labs below occur on the same page; their relationship is not established — a value shown is a number found on the page, not a confirmed reading. Verify the page.
| Date / source | Page candidates |
|---|---|
| Asbestos TEM analysis, 100 Trinity Place, Feb 2002 2002-02-11 NYC-WTC_000257091 · p. 1 ↗ | asbestos Values found on the page: 95% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.55 (how sure the index is that this page concerns this building) · verify |
| Asbestos TEM analysis, 104 East 25th St, Mar 2002 2002-03-16 NYC-WTC_000310478 · p. 3 ↗ | asbestos Values found on the page: 95% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.55 (how sure the index is that this page concerns this building) · verify |
| TEM asbestos report, HS [name], May 2002 2002-05-04 NYC-WTC_000257957 · p. 3 ↗ | asbestos Values found on the page: 95% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.55 (how sure the index is that this page concerns this building) · verify |
Documents for this building
10 documents across 2 boxes, grouped by what each document is. Titles and summaries are machine-written; the page image is the authority.
Chain of custody · 1
TEM asbestos analysis results for HS [name], May 2002.
23 pages · 2002-05-04 · Education, Dept. of · Box — · test candidate pages · matched page 3Unclassified · 9
Asbestos analysis via TEM for BOE HS project 6331, Jan 2002.
2 pages · 2002-01-24 – 2002-01-25 · Education, Dept. of · Box — · matched page 1TEM asbestos analysis for AHERA at 100 Trinity Place, Feb 2002.
1 page · 2002-02-11 · Education, Dept. of · Box — · test candidate pages · matched page 1Asbestos fiber analysis by TEM performed by ATC Associates; report transmitted Feb 11, 2002.
8 pages · 2002-02-11 · School Construction Authority · Box — · matched page 1TEM asbestos analysis data for AHERA (Mar 16, 2002).
3 pages · 2002-03-16 · Education, Dept. of · Box — · test candidate pages · matched page 3IAQ field data for project 15-19125-0291 at HS Finance.
10 pages · no date extracted · Education, Dept. of · Box — · matched page 3Site IAQ data page for BOE monitoring; project 15-19125-0291.
11 pages · no date extracted · Education, Dept. of · Box — · matched page 8ATC IAQ field data for 100 Trinity Place site in 2002 project 15-19125-0291.
12 pages · no date extracted · Education, Dept. of · Box — · matched page 10IAQ data for project 15-19125-0291 from 100 Trinity Place.
10 pages · no date extracted · Education, Dept. of · Box — · matched page 7IAQ field data from 100 Trinity Place for project 15-19125-0291.
11 pages · no date extracted · Education, Dept. of · Box — · matched page 8Related buildings on the same block
Block-lot keys and present-day footprint joins; not a reconstruction of 2001 buildings.
No same-block matches established by this place’s block-lot key or present-day footprint join.