Browse records
The order the City kept.
Follow the collection, box and handwritten folder label to the documents inside.
Documents in this folder
Folder label / City-provided: OEM Emergency Operations Center: 7 WTC Proposal for Additional Architectural and Engineering Design Services: Upgraded Revised 'Protective Wall' Design and Scope Revisions: Cost Reduction Scope Revisions SHCA Project No. 5576CC
2 documents · 5 pages
Proposal cover letter for OEM design services, June 1998 ↗
3 pagesNYC-WTC_000167203 – NYC-WTC_000167205
Cover letter submitting a proposal for architectural and engineering design services to the Mayor's Office of Emergency Management.
Fax transmission log, June 1998 ↗
2 pagesNYC-WTC_000167208 – NYC-WTC_000167209
One-page fax transmission log for documents regarding the Mayor's Office of Emergency Management project identified by document number NYC-WTC_000167206.